Projects

Derby Creek Enhancement

The project involves removing fish barriers at two culvert crossings, reestablishing a natural confluence at the Sammamish River, realigning the Sammamish River Trail to accommodate the new fish-passable stream culvert, and providing riparian terracing for vegetation planting. The project will provide approximately 800 linear feet of stream enhancement, reduce flooding, and open fish access to …

Derby Creek Enhancement Read More »

Lakehaven Utility District Electrical Engineering

Lakehaven Utility District Electrical Engineering

The Lakehaven Utility District provides drinking water and sewer service to approximately 112,000 people. Since 2014, Parametrix has provide on-call electrical engineering services for the Lakehaven Utility District. Projects have included:

Newport Avenue Corridor Improvements

Newport Avenue Corridor Improvements

Parametrix partnered with the City of Bend and a local contractor and construction manager to deliver this roadway and stormwater project through the construction manager/general contractor (CM/GC) method.

Alameda Drain and Trail

Alameda Drain and Trail

Parametrix has worked with Bernalillo County on the Alameda Drain and Trail from preliminary planning and environmental reviews, including development of master plan and corresponding categorical exclusion, through design and construction.

Seattle Multimodal Terminal Renovation

Seattle Multimodal Terminal Renovation

Parametrix provided advisory services and change management support for WSDOT’s first GC/CM project—the Washington State Ferries (WSF) division’s reconstruction of its occupied flagship ferry terminal. The project is a joint undertaking of WSF and the King County Ferry District because it involves the simultaneous work for the collocated passenger-only ferry terminal facility. Parametrix helped WSF …

Seattle Multimodal Terminal Renovation Read More »

Sea-Tac North Satellite Renovation and Expansion

The North Satellite modernization project expanded and renovated the 44-year-old facility to better serve passengers and respond to continuing growth at Seattle-Tacoma International Airport. It included adding eight new gates with a 240-foot extension of the building to the west, adding an upper-level mezzanine, doubling the existing dining and retail square footage, and introducing a …

Sea-Tac North Satellite Renovation and Expansion Read More »

Sea-Tac International Arrivals Facility

Sea-Tac International Arrivals Facility

The Port of Seattle added a new International Arrivals Facility, updating the current capacity with a new 450,000-square-foot building and passageways, including a 900-foot-long, 85-foot clear pedestrian bridge over active jetways. This new facility more than doubles the incoming passenger capacity, increasing the baggage capacity from 668 linear feet to 1,806 linear feet, and increases …

Sea-Tac International Arrivals Facility Read More »

Sea-Tac Baggage Optimization Project

The baggage optimization program at Sea-Tac International Airport is replacing aging equipment in stages throughout the airport. The improvements will improve the efficiency of each component of the overall system. Parametrix has provided construction management services to complement the Port’s construction management and blended consultant team. Our services have included oversight of change management processes; …

Sea-Tac Baggage Optimization Project Read More »